MapLink™ | Procedures | Accessory Solar Energy Systems (ASES)

Hello! Content on this website is provided as a convenience and is for informational use only. Be sure to review the Terms of Use for all of the details related to your use of this website.
Accept
Back
Accessory Solar Energy Systems (ASES)
H12 accessory solar energy system ("ASES").
(1) Criteria applicable to all accessory solar energy systems:
Accessory solar energy systems shall require a building permit and be accompanied by standard drawings demonstrating compliance with the building code, as amended. A ground-mounted system shall require a zoning permit.
 
H13 Structure, temporary.
(1) The time period of the initial permit for a temporary structure shall not exceed six months. This permit may be renewed for three-month time periods, not to exceed a total of 21 months from the initial permit. Extensions must be approved by the Zoning Officer. A garage or other accessory building, partial structure or temporary structure may be used for dwelling purposes subject to cooking and sanitary services being provided. Such structure or use shall be removed completely upon expiration of the permit without cost to the municipality.

(2) The applicant shall provide the Township with plans for temporary structures to ensure: adequate parking, emergency access, road access, sanitary facilities, refuse collection, noise control and cleanup after the expiration of the zoning permit allowing for said temporary structures. The plans shall be reviewed by the Planning Commission and the Board of Supervisors prior to the issuance of a zoning permit for the temporary structures.
 
H14 Use, temporary.
A land development plan is required in compliance with SALDO requirements.

See § 200-044-080L for complete, detailed information.